2013 年 Sumitomo SH135X-3B Track Excavator
Numéro de l'article
3451774
Site
Narita City, Japan.
Marketplace
Marketplace-E
Vendu le
20/04/20
Offre gagnante
JP 4 370 000 ¥
# d'offres
1
VENDU!
DÉTAILS RELATIFS À L'ARTICLE
Relevé du compteur
4 019 Heures
Nº de série
900mm Tooth Bucket, 2400mm Stick, Check Valves, 500mm Track Shoes, Rubber Pads, Rear View Camera, Control Pattern Changer, Safety Rails, A/C, Heater ***EU Stage II EPA Approved***
機械詳細
稼働時間 : 4019 時間
シリアル : SMT135X3C00SD7786
900mm バケット, 2400mm アーム, クレーン仕様, 500mm シュー幅, ラバーシュー, リアモニター操作レバー切り替え,, A/C, ヒーター ***EPA***
機械詳細
稼働時間 : 4019 時間
シリアル : SMT135X3C00SD7786
900mm バケット, 2400mm アーム, クレーン仕様, 500mm シュー幅, ラバーシュー, リアモニター操作レバー切り替え,, A/C, ヒーター ***EPA***
Rapport d'inspection
En tant qu'acheteur, veuillez noter que vous êtes responsable de l'examen de la totalité du rapport d'inspection lors de l'évaluation d'un article.
Apparence générale
|
Safety
|
Control Station
Engine
|
Drivetrain
|
Hydraulics
|
Chassis
|
Undercarriage
|
Specialty
|
Réclamations :
This item is offered with IronClad Assurance® protection. With IronClad Assurance®, if a buyer discovers that the item is not substantially in the condition as represented in this inspection report, the buyer may submit a written dispute claim to IronPlanet. Following submission of a written dispute claim, IronPlanet will investigate the claim, re-inspecting the equipment item as necessary, and determine a fair and mutually beneficial resolution. Please note that IronPlanet inspections are performed solely for the purpose of reporting the visible condition of the equipment's major systems and attachments on the day of the inspection and do not include load testing or digging/lifting. These inspections are not designed nor intended to detect latent defects, or conditions that could only be found in connection with the physical dismantling of the equipment or the use of diagnostic tools or techniques. This inspection report includes ratings, comments, and photos of the various components of the item. Knowledgeable buyers are expected to carefully review all of the available information in the inspection report, including all photographs, in order to make the best bidding and buying decision possible.
This item is offered with IronClad Assurance® protection. With IronClad Assurance®, if a buyer discovers that the item is not substantially in the condition as represented in this inspection report, the buyer may submit a written dispute claim to IronPlanet. Following submission of a written dispute claim, IronPlanet will investigate the claim, re-inspecting the equipment item as necessary, and determine a fair and mutually beneficial resolution. Please note that IronPlanet inspections are performed solely for the purpose of reporting the visible condition of the equipment's major systems and attachments on the day of the inspection and do not include load testing or digging/lifting. These inspections are not designed nor intended to detect latent defects, or conditions that could only be found in connection with the physical dismantling of the equipment or the use of diagnostic tools or techniques. This inspection report includes ratings, comments, and photos of the various components of the item. Knowledgeable buyers are expected to carefully review all of the available information in the inspection report, including all photographs, in order to make the best bidding and buying decision possible.
Informations importantes
Détails relatifs au paiement
- L’acheteur est tenu d’effectuer le paiement complet, taxes et frais compris, dans les 7 jours ouvrés qui suivent l’enchère pour éviter des frais de retard.
- Cet article est soumis à une Japan taxe de vente en l’absence de preuve d’exonération ou de déclaration d’acheminement par transporteur public dans un autre état au moment de l’achat.
- Payment can be made by wire transfer.
- Les offres ne peuvent pas être retirées et sont fermes jusquà 2 jours ouvrables après la fin de l’enchère. Le défaut de paiement de l’article en question entraînera des frais supplémentaires..
Prix de clôture de l'enchère | Frais de transaction |
1 ¥ à 1 000 000 ¥ | 10% du prix de clôture (10 000 ¥ min) |
1 000 000 ¥ à 3 400 000 ¥ | 4.85% du prix de clôture (100 000 ¥ min) |
Plus de 3 400 000 ¥ | 164 900 ¥ |
Détails relatifs au transport et à l'enlèvement
- La totalité des frais liés à l’acheminement de l’article est à la charge de l’Acquéreur.
- L’article doit être enlevé dans un délai de 8 jours ouvrables après l’enchère.
Termes d'enlèvement
Sous faute d'observation des présentes conditions, le Vendeur pourrait refuser au conducteur de ramasser les articles achetés.
You must call at least 24 hours in advance to schedule pickup
Le conducteur DOIT fournir une copie de Renonciation à l’Article d’IronPlanet pour le prendre en charge.
Sous faute d'observation des présentes conditions, le Vendeur pourrait refuser au conducteur de ramasser les articles achetés.
You must call at least 24 hours in advance to schedule pickup
Le conducteur DOIT fournir une copie de Renonciation à l’Article d’IronPlanet pour le prendre en charge.
Financement
Questions
Les chargés de clientèle sont disponibles du lundi au vendredi, de 9 h 30 à 18 h 00. (Heure d'Europe) |
||
Téléphone | +353 (0)1 860 5000 | |
Nº de fax | +353 (0)1 860 5021 | |
eucustomercare@ritchiebros.com |